1-bedroom apartment project in Cap Cana | Construction- WG
Cap Cana, Punta Cana, La Altagracia, República Dominicana.
Price from:
USD$ 233,000
State:
Apartaments under construction
Delivery:
February, 2025
-
61 m2
-
1 Bed.
-
1 Park
-
1.5 Bath.
Description:
A marvelous and modern design from the famous award-winning Spanish studio MORPH, among these numerous international architecture awards, the most recent one is the “Architecture design of the year” OPAL 2021.
It is a unique and exclusive project due to its luxury location and excellent amenities. It is being developed on a 45,000 M2 site and will have 296 units of 1, 2, and 3 bedrooms, all with spectacular views of the Golf Course.
In addition to these amenities, the project stands out for its design and the quality of its finishing. Its architecture allows us to have many terraced apartments, unique for the shape of their terraces. All of them overlook the magnificent golf course of Las Iguanas (Jack Nicklaus’s signature).
Next, learn more about this project. Characteristics of the apartment:
Type 102
Area| 61.89 M2 (666.17 FT2)
Roofed Terrace 9.66 M2 (103.97 FT2)|
Unroofed Terrace 12.32 M2 (132.61 FT2)
Blocks B and C
1 Bedroom with Bathroom and Walk-in Closet
Living / Dining room
Kitchen
Laundry room
Roofed and unroofed terrace
Prices from US$ 233,000
Type 103
Area| 63.06 M2 (678.77 FT2)|
Roofed terrace 13.63 M2 (146.71 FT2)|
Unroofed terrace 13.52 M2 (145.52 FT2)
Block F and G
1 Bedroom with Bathroom and Walk-in Closet
Hall
Kitchen
Living / Dining room
Roofed and unroofed terrace
Prices from US$ 270,000
Type 104
Floor area| 61.57 M2 (662.73 FT2)|
Roofed terrace 13.94 M2 (150.04 FT2)|
Unroofed terrace 2.72 M2 (29.27 FT2)
Blocks B, C, D, E, F, F, G, H, I, and J.
1 Bedroom with Bathroom and Walk-in Closet
Living / Dining room
Kitchen
Laundry room
Roofed and unroofed terrace
Prices from: US$ 223,000
Handover date: Beginning 2025.
Payment method:
US$ 5,000 to reserve the apartment
25% (max 30 days after reservation)
55% during construction (monthly, quarterly payments)
20% upon handover (expected February 2025)
First payment during construction – April 2023
Last payment during construction – December 2024